MIL-T-46780D(AT)
8736775 - Supplementary Quality Assurance Provisions for Truck, Tank: Water 1000 Gallon, 2 1/2 Ton, 6X6, M50A3 WO/Winch.
8736597 - Supplementary Quality Assurance Provisions for Truck Tractor:
2 1/2 Ton, 6X6 M275A2, W/Winch.
8736598 - Supplementary Quality Assurance Provisions for Truck Dump:
2 1/2 Ton 6X6, M342A2, WO/Winch.
8736600 - Supplementary Quality Assurance Provisions for Repair Shop
Truck Mounted: 2 1/2 Ton, 6X6, M185A3, WO/Winch.
8736601 - Supplementary Quality Assurance Provisions for Chassis, Truck:
2 1/2 Ton, 6X6, M45A2, WO/Winch.
8736602 - Supplementary Quality Assurance Provisions for Chassis, Truck:
2 1/2 Ton, 6X6, M45A2G , WO/Winch.
8736603 - Supplementary Quality Assurance Provisions for Chassis, Truck:
2 1/2 Ton, 6X6, M46A2C, W/Winch.
8736604 - Supplementary Quality Assurance Provisions for Chassis, Truck:
2 1/2 Ton, 6X6, M45A2G, W/Winch.
8736733 - Supplementary Quality Assurance Provisions for Truck, Cargo: Drop Side, 2 1/2 Ton, 6X6 M35A2C, WO/Winch.
8736735 - Supplementary Quality Assurance Provisions for Truck, Cargo: Drop Side, 2 1/2 Ton, 6X6, M35A2C W/Winch.
8736769 - Supplementary Quality Assurance Provisions for Truck
Maintenance, Pipeline Construction, 2 1/2 Ton, 6X6, M756A2
W/Winch.
8736782 - Supplementary Quality Assurance Provisions for Truck,
Maintenance, Earth Borer, Pole Sitter, 2 1/2 Ton 6X6, M764, W/Winch.
4.1.5 In-process inspection.
4.1.5.1 In-process inspection. During fabrication of the first production vehicle of each model, an in-process inspection will be conducted by Government representatives (see 3.1) to evaluate conformance of materials and workmanship with drawing and specification requirements. These inspections shall be made at the contractor's or sub-contractor's facility prior to the application of primer or paint.
4.1.5.2 Review and evaluation. Review and evaluation of records for processing procedure, inspection systems and plan of quality control, will be conducted on the following: material, welding, surface hardening, heat treating, protective finishes, etc.
4.1.5.3 Complete vehicle inspection. The first vehicle of each model, when complete shall be inspection by the Government, subsequent to contractor's inspection at the acceptance inspection location specified in contract, to determine conformance to contract and specification requirements.
23
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business