MIL-T-46780D(AT)
4.1.1 Contractor quality control system. Unless otherwise specified by the procuring activity, the contractor shall provide and maintain an effective inspection and quality control system acceptable to the Government covering the supplies under the contract. A current written description of the system shall be submitted to the Procuring Contracting Officer or his
authorized representative prior to initiation of production. The contractor will not be restricted to the inspection station or to the method of inspection listed provided that an equivalent limitation
is included in the approved quality control procedure. The contractor shall notify the
Government and obtain approval for any change to the written procedure that might affect the
degree of control required by this specification or other applicable documents referenced therein.
4.1.2 Government evaluation. All quality control operations performed by the contractor will be subject to Government evaluation at unscheduled intervals. Evaluation will consist of
(a) validating the conformance of the contractor to his established quality instructions,
(b) continuous contractor decision verification of the contractor's documented evidence relative
to product quality characteristics. Deviation from the prescribed or agreed-upon procedures, or instances of poor practices which might have an effect upon the quality of the product, will be immediately called to the attention of the contractor. Failure of the contractor to promptly correct deficiencies discovered shall be cause for suspension of acceptance until such time objective evidence has been furnished by the contractor that corrective action has been taken to eliminate the conditions which caused the deficiencies and to preclude recurrences.
4.1.3 Qualified products and materials. The contractor's inspection records shall be checked to determine contractor conformance to 3.2. The contractor shall provide the Government with evidence that materials (see 3.2.1) used are as specified in the applicable specifications and drawings.
4.1.4 Parts and components. Parts, components and assemblies shall be inspected in accordance with Engineering Parts Lists (see Table II) and Master List of Supplementary Quality Assurance Provisions (see Table V).