MIL-C-62310A(AT)
4.4.1.3 Preliminary examination. The responsible Government inspection element will
conduct a preliminary examination, as specified in 4.6.2, of the first completed production
vehicle.
4.4.1.4 Provisional inspection. Provisional inspection of the first completed production
vehicle will be conducted jointly by representatives of TACOM Product Assurance Directorate
and the responsible Government inspection element. Contractor shall provide any required
assistance. Testing will be as specified in 4.6.5. Contractor shall make available his inspection
plan, records, and certifications pertinent to the vehicle and components.
4.4.1.5 Repair of defects. Defects found as a result of the foregoing inspections shall be
corrected by the contractor at no cost to the Government. Failure of the contractor to correct
defects promptly shall be cause for suspension of acceptance of vehicles until corrective action
has been accomplished and approved by the Government.
4.4.1.6 Vehicle disposition. On completion of first production vehicle inspection, the
vehicle shall remain at the manufacturing facility, as a production sample, and shall be the last
vehicle shipped on contract. Vehicle may be released sooner at the discretion of the
Government. The contractor shall service and maintain vehicle during this period.
4.4.1.7 Final approval and acceptance. Final approval and acceptance of the first production
vehicle shall be withheld until second and third vehicles are accepted (see 4.4.2).
4.4.2 Second and third initial production vehicles inspection. Two additional vehicles
(see 4.4) from the first month's production, or the first 20 produced, will be subjected to the
initial production test.
4.4.2.1 Initial production test. To determine conformance to Section 3 (inclusive), vehicles
will be examined as specified in 4.6.2, and tested as specified in table VI. Subsequently, both
vehicles will be tested for 5000 miles, as specified in table II. Inspection will be performed by
the Government, and will require no more than 90 days. The contractor shall expeditiously
furnish repair parts, as required to support testing.