MIL-C-62310A(AT)
4.7.9.1.1 Auxiliary generator test (M577A2). To determine conformance to 3.4.9.1.1,
auxiliary generator shall be examined and command post equipment operated to determine
continuous amperage output.
4.7.9.2 Lighting test. All lights shall be operated during and after break-in run throughout
all stages of operation, and observed to determine conformance to 3.4.9.2.
4.7.9.3 Heater electrical test. To determine conformance to 3.4.9.3, the heater electrical
control shall be turned on and the heater shall start and operate with the vehicle electrical system
and diesel fuel.
4.7.9.4 Communication and electrical circuits test. To determine conformance to 3.4.9.4,
electrical circuits supplying current to vehicle equipment shall be tested at all points to assure
continuity throughout the circuits. Previously tested circuits shall be functionally tested after
installation.
4.7.9.5 System voltage characteristics test. System voltage characteristics shall be evaluated
as specified in MIL-STD-1275 to determine conformance to 3.4.9.5.
4.7.9.6 Electromagnetic interference suppression test. To determine conformance to 3.4.9.6,
vehicle shall be tested as specified in MIL-STD-462.
4.7.10 Controls test. All controls shall be operated as specified and observed to determine
conformance to 3.4.10.
4.7.11 Adjustment mechanisms test. To determine conformance to 3.4.11, all adjustment
mechanisms shall be observed during operation, examined for proper adjustment, and adjusted if
required.
4.7.12 Trim vane test. To determine conformance to 3.4.12, trim vane shall be examined for
proper installation, and extended and retracted during amphibious operation to observe proper
function.
4.7.13 Ramp system test. To determine conformance to 3.4.13, ramp hydraulic system shall
be examined for internal cleanliness prior to filling, and for leaks before and after operation.
Subsequently, the ramp shall be operated to fully opened and closed positions and the required
time determined.
4.7.14 Stowed material test. To determine conformance to 3.4.14, all manufacturer and
depot installed OVM shall be stowed (combat loaded) on the vehicle. All interior and exterior
items shall fit in the spaces provided. The material shall be removed after the test. The OVM
shall be of the latest configuration available to the contractor. The contractor shall be permitted
to unpackage and repackage equipment used for test (for domestic shipment only).
28
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business